Sewer SCADA System Replacement

Project ID: 
(SU0113)
Project Type:
Sewer
Project Status: 
Under Construction

project location​​Project Status

To help keep area residents informed of our construction progress, we will post project updates to this site on a regular basis. Click here to see status updates.

Project Details/Neighborhood 

  •  Various sewer facility locations on Mercer Island

​Background

In 2023 and 2024, the City will be upgrading the equipment and communications system at 17 sewer pump stations and select emergency generators around the island. These pump stations move sewage through the sewer lakeline, which rings the island, to discharge points at the north and south ends of the island. From those points, flow moves into the King County system for off-island treatment and disposal. Efficient and reliable operation of the pump stations is vital to maintaining a high level of sanitary sewer service for existing customers. SCADA, or Supervisory Control and Data Acquisition, is the system that the City uses to remotely monitor flows throughout Mercer Island's sewer network. The City's current system is outdated, and repair components for the system are often no longer available, decreasing staff's ability to respond and address issues that arise. Upgrading the controls, alarms, and communication equipment will allow the City's services to run smoothly.

Description

The Sewer SCADA Equipment Replacement Project consists of programmable logic controller (PLC) panel replacement, instrument demolition and replacement, go/no-go panel installation, generator monitoring improvements, field testing and commissioning services for the new control system equipment, and all associated electrical work and training at seventeen of the City's sewer pump station sites..

Construction Project Timeline

Planning/Design (Q1 of 2019 - Q1 of 2023)
Under Construction (Q3 of 2024 - Q4 of 2025)

Contact

Christopher Marks, City of Mercer Island Utilities Engineer: chris.marks@mercerisland.gov
www.mercerisland.gov/SU0113

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 
PS 16 Generator
PS 17 Generator
City Operators review 90% sewer SCADA screens
A QCC technician verifies each panel circuit functions according to design specifications.
Brown & Caldwell program and test each of the Operator Interface Terminals (OITs) to run the new SCADA software.
The Contractor uses a tri-pod hoist to lower new panels into the pump station
 All equipment is transported and installed the City’s below grade dry well vault.
Valley Electric wires in the IS and PLC panels.
The easy vehicle access of PS 16 has allowed Valley Electric to complete panel installation ahead of schedule.
Valley Electric pulls new conductor wire between the generator and the pump station to support new monitoring outputs.
Top view of PS 17 located in the backyard of a lakefront residence.
View from inside PS 17 where the majority of equipment is placed.
Flush station 12 is the latest station to be cutover to new SCADA.
Electricians from Valley Electric remove the old PLC panel from the station.
A look at the new SCADA screen for PS 16 provides an enhanced overview of station conditions while on generator power.
Valley Electric upgrades the tenth of eighteen stations to new SCADA.
Valley Electric carefully transports the Programmable Logic Controller (PLC) cabinet to the station.
The PLC cabinet is carefully lowered into the station vault using a tripod and chain hoist.
Valley Electric uses a conduit bender during a snow flurry.
Status Updates

February 6, 2025

After successfully upgrading and starting up Pump Station 10, Valley Electric moved on to Pump Station 25, located near the Mercerwood Shore Club. Unlike Pump Station 10, this site presented fewer terrain challenges, with the main difficulties coming from snow, cold temperatures, and slick roads. Despite the weather, the team worked diligently to finish panel install and wiring. Testing and commissioning of Pump Station 25 and work start at Pump Station 1 are scheduled for next week.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 

January 23, 2025

Last week, Valley Electric appreciated working at a site with easy access, free from the usual challenges of hiking, climbing, or navigating steep slopes and driveways. Pump Station 23, located in a community park at 5406 96th Ave SE, was successfully added to the new SCADA platform in record time, joining the other nine sites already upgraded. This week, the team is back to tackling tougher terrain at Pump Station 10, located at 9036 N Mercer Way. The site features a winding 23% grade access road and several timber steps, making equipment delivery and installation more challenging. The station is expected to be cut over by Friday of next week.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

January 9, 2025

This week, Pump Station 22, located at 6223 N Mercer Way, will be cut over to the new SCADA system. This station posed a unique challenge due to the significant distance—nearly 500 feet—between the station and the emergency standby generator. Fortunately, Valley Electric was able to successfully pull new wiring through the nearly 60-year-old underground conduit, enabling the generator’s signals to be monitored via hardwire instead of wireless transmission, as required at other sites. The project is now 60% complete and remains on schedule for final completion by July 2025.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

December 17, 2024

A lot has been accomplished over the past three weeks. Valley addressed all minor deficiencies at flushing station 12 and pump stations 15–19, while successfully transitioning pump stations 20 and 21 to the new SCADA system. Between now and the New Year, Valley will begin preparing stations 10, 22, and 23, located at 9036 N Mercer Way, 6223 E Mercer Way, and 5406 E Mercer Way, respectively. The project remains on track for completion by July 2025.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

November 21, 2024

This week, Valley Electric successfully installed and wired the new panels and equipment at Pump Station 19, located at 7651 W Mercer Way. This station is the most challenging to access on the Island, requiring a 1/8-mile trek across a steep, grassy waterfront. Despite these difficult conditions, the team overcame the cold, wind, and rain to complete the cutover to the new SCADA system. Pump Station 19, along with other recently upgraded stations, underwent its first real-world test as the Island continues to operate without utility power. Each site successfully transitioned to emergency standby generator power and maintained continuous monitoring of station activities and alarm statuses, ensuring reliable operation during this period.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

November 12, 2024

The project is nearing the 30% completion milestone, with SCADA upgrades successfully completed at sewer pump stations 12, 15, 16, 17, and 18. This week, Valley Electric will begin upgrades at Pump Station 19 (7651 W Mercer Way). Upgrades will continue at Pump Stations 20 (8790 85th Ave SE) and 21 (8002 Avalon Pl) starting December 5th and December 12th, respectively. The project will pause after December 20th and resume in the new year.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

November 6, 2024

Last week, Pump Station 17 (located at 6425 77th Ave SE) was successfully upgraded to the new SCADA (Supervisory Control and Data Acquisition) system. Pump Station 17 is the first site to feature a Remote Input/Output (RIO) panel, which establishes a wireless connection between the station and its emergency standby generator. The installation of RIO panels is part of a broader upgrade at eight sites, where either damaged conduit or challenging terrain has made it difficult to install traditional hardwired connections. The contractor expects to bring Pump Station 18 (7201 W Mercer Way) online later this week. With the upcoming holiday next week, Valley Electric will focus on revisiting Flushing Station 12 for additional work and addressing any remaining punchlist items at the stations that have already been completed.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

October 24, 2024

We are pleased to announce that Valley Electric has completed the majority of work at Pump Station 16 ahead of schedule, thanks in part to the station’s easier accessibility. The station, located at 5495 W Mercer Way, is expected to come online by the close of business on Thursday, October 24. This will be the second City sewer site to implement the new SCADA interface, following the successful launch at Pump Station 15 on October 18. Looking ahead, Pump Station 17, located at 6425 77th Ave SE, is next in line for the upgrade and cutover process.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

October 17, 2024

1.	All equipment is transported and installed the City’s below grade dry well vault     2.	Valley Electric wires in the IS and PLC panels.

Photos

  1. All equipment is transported and installed in the City’s below-grade dry well vault.
  2. Valley Electric wires in the IS and PLC panels.

This past week, Valley Electric has been busy installing panels, instruments, conduit, and wiring at PS 15, located at 4765 Forest Ave SE. Despite the challenges of working in a confined space, they are on track to have the station ready for startup and testing by the end of the week. PS 15 will be the first station to implement the new SCADA interface, marking an important milestone in the project. Next week, Valley Electric will shift their efforts to PS 16 at 5495 W Mercer Way.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

October 10, 2024

The Contractor uses a tri-pod hoist to lower new panels into the pump station

Photo: The Contractor uses a tri-pod hoist to lower new panels into the pump station

Residents near sewer pump stations 12, 15, 16, and 17 may have noticed increased work vehicles and personnel from Valley Electric and the City of Mercer Island. We want to inform you that work has officially begun—or will soon begin—at these locations. Valley Electric will be on-site for approximately two weeks at each station, focusing on replacing electrical control panels and instrumentation in both the dry and wet wells.

 

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

September 26, 2024

Valley Electric has announced that all equipment panels for the first eight pump stations have arrived at their facility and are now being prepared for delivery. Each site will require the installation of at least four panels, including: PLC (Programmable Logic Controller) panel, Intrinsically Safe panel, Go/No-Go panel, and Horn/Beacon panel. Additionally, some generator sites will receive an RIO (Remote Input/Output) panel to enhance wireless communications. The first three stations scheduled to receive these panels, along with wiring and upgrades, are Stations 12, 15, and 16, beginning the second week of October. We anticipate that there will be no impact on the sewer collection system during construction. Most work will take place inside the stations; however, residents in the surrounding areas may notice an increase in work vehicles at the project sites.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

August 2024
1.	A QCC technician verifies each panel circuit functions according to design specifications.     2.	Brown & Caldwell program and test each of the Operator Interface Terminals (OITs) to run the new…SCADA software. 
Photos:

  1. A QCC technician verifies each panel circuit functions according to design specifications.
  2. Brown & Caldwell program and test each of the Operator Interface Terminals (OITs) to run the new SCADA software.

Activity on the project continues to ramp up as the team inches closer to the construction start date, now set for the second week of October. We are pleased to report that all electrical permits have been secured. This week, Factory Acceptance Testing (FAT) was conducted for the first batch of electrical panels at Quality Controls Corporation (QCC), covering 8 out of the 17 planned sites. During FAT, each panel undergoes rigorous testing for compliance with project design specifications, a process that involves meticulously checking each wire, component, and hardware function. As an added benefit, Brown and Caldwell was able to test that all analog and digital signals were accurately displayed on the new sewer SCADA screens.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

July 2024

Material and equipment continue to arrive at QCC’s (systems integration subcontractor) warehouse. After all system control panels have been built-up by QCC, each component will undergo factory acceptance testing (FAT). FAT is a critical step in the quality assurance process that ensures all equipment performs according to specification, prior to delivery and installation. FAT will be observed by City staff along with representatives from Brown & Caldwell, QCC, and the various equipment suppliers. FAT for the first batch of station equipment is scheduled for late August.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

June 13, 2024

City Operators review 90% sewer SCADA screens

Photo: City Operators review 90% sewer SCADA screens

On June 12th, City staff met with Brown & Caldwell to demonstrate the proposed SCADA screens for each sewer site. City operators were given a chance to navigate menus, export reports, issue control commands, and acknowledge alarms all within a simulated environment. With a scheduled construction start of September, the first site to come online with upgraded SCADA could be as early as October of this year. To prepare for the system cutover, City staff will continue to familiarize themselves with the upgraded SCADA interface and provide feedback to Brown & Caldwell to fine-tune the finished product.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

May 22, 2024
The project team continues to track the arrival of critical panel equipment and final work plans for each of the 17 sites. City staff is also tracking the progress of remaining project permits – the Contractor’s electrical permit and the last shoreline development permit are expected shortly. Construction mobilization is still expected for September.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

March 29, 2024
At the beginning of the month, Valley Electric along with their systems integrator, QCC, visited all 17 sewer pump stations to verify site conditions and make additional preparations for construction. While some control and electrical panel equipment has arrived, other critical components are not expected until late August. The project team continues to meet regularly to finalize the construction work plans, and also arrange for the controls, monitoring, and contingencies necessary to take station components temporarily offline. Construction is still forecasted for September of 2024. 

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

January 29, 2024
PW staff are currently reviewing Brown & Caldwell’s submittal of the Operator Interface Terminal (OIT) screens. These screens turn the raw data from each sewer pump station into usable information. The OIT screens will not only provide the City’s operators, technicians, and engineers full site monitoring and alarm status, but will also allow local control of station equipment. The City has also been working closely alongside Brown & Caldwell and Valley Electric to track the shipment of vital project equipment. Construction start is still forecasted for September of 2024. 

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

December 2023

The project team met last month to discuss the component, functional, and operational testing requirements for the new equipment being installed at each of the pump stations. This project poses unique challenges given that each station will need to remain fully operational throughout the SCADA system upgrades. Valley Electric continues the submittal approval process. The expected delivery schedule for long-lead items remains unchanged. Construction start is still forecasted for September of 2024.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

October 2023

City staff continues to work with the project’s engineering design consultant (Brown & Caldwell) to review submittals from the City’s contractor (Valley Electric). The project team recently finished reviewing and providing comments for the proposed control system equipment panels and racks at pump station 15, which is the first station where work will be performed. Due to material supply shortages, mobilization on the project is still not expected until September of 2024.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

August 2023 Update

While actual construction is not set to begin until the Fall of 2024, Valley Electric is busy ordering critical items with long lead times, performing internal quality control and testing, discussing cutover work plans, gathering submittals, and conducting supplementary site visits. With each of the City’s 17 sewer pump stations being of varying ages and configurations, none of the work is “one size fits all”, but instead, is engineered to fit each station.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

July 2023 Update

PS 16 Generator     PS 17 Generator
Image 1: PS 16 Generator
Image 2: PS 17 Generator

The project has been issued Shoreline Exemption Permits for 14 of the 17 stations. City staff continues to work to receive permit clearance for the remaining 3 sites. On February 23rd of this year, a project kickoff meeting was held with the successful contract bidder, Valley Electric. On May 9th, a site familiarization meeting was held to familiarize Valley Electric with the logistical and spatial challenges specific to the different work sites. Currently, and in the following months, Brown & Caldwell, in coordination with City Staff, will review and approve Valley Electric’s various product and work submittals.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

May 2022 Update

Brown and Caldwell provided an example Shoreline Exemption Permit package for one pump station. Staff have been reviewing these documents and coordinating with Community Planning and Development to ensure all the required elements are met before continuing work for the remaining sites.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

April 2022 Update

In February, the City received the 90-percent plans and specifications from Brown and Caldwell, the engineering consultant. Staff reviewed these preliminary documents and provided comments back to the consultant in April. The consultant will work on finalizing these documents in the next couple of months.  The consultant will also be providing permitting assistance on this project associated with a Shoreline Exemption Permit.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

February 2022 Update

Staff have been investigating permits for this upgrade. Due to the location of these sites, additional permits are required, some which have complex application processes. Some schedule setbacks are anticipated to delay bidding.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

November 2021 Update

Brown and Caldwell have been working on the pilot design at one of the sewer pump stations. This model will pave the way for the remaining 16 sites. Additional work is also underway to add monitoring capabilities for the emergency back-up generators.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

September 2021 Update

The City’s consultant Brown and Caldwell started design work for the 17 sewer sites in August, starting with the sewer pump station in the Brook Bay neighborhood. They will continue with design of the other stations this fall and early winter and plan to put the project out for construction bids in February 2022.

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

 

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

 

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download

 

 

 

 

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download